AGL36.97▲ 0.39 (0.01%)AIRLINK189.64▼ -7.01 (-0.04%)BOP10.09▼ -0.05 (0.00%)CNERGY6.68▼ -0.01 (0.00%)DCL8.58▲ 0.06 (0.01%)DFML37.4▼ -0.48 (-0.01%)DGKC99.75▲ 4.52 (0.05%)FCCL34.14▲ 1.12 (0.03%)FFL17.09▲ 0.44 (0.03%)HUBC126.05▼ -1.24 (-0.01%)HUMNL13.79▼ -0.11 (-0.01%)KEL4.77▲ 0.01 (0.00%)KOSM6.58▲ 0.21 (0.03%)MLCF43.28▲ 1.06 (0.03%)NBP60.99▲ 0.23 (0.00%)OGDC224.96▲ 11.93 (0.06%)PAEL41.74▲ 0.87 (0.02%)PIBTL8.41▲ 0.12 (0.01%)PPL193.09▲ 9.52 (0.05%)PRL37.34▼ -0.93 (-0.02%)PTC24.02▼ -0.05 (0.00%)SEARL94.54▼ -0.57 (-0.01%)TELE8.66▼ -0.07 (-0.01%)TOMCL34.53▼ -0.18 (-0.01%)TPLP12.39▲ 0.18 (0.01%)TREET22.37▼ -0.21 (-0.01%)TRG62.65▼ -1.71 (-0.03%)UNITY32.47▼ -0.24 (-0.01%)WTL1.75▼ -0.04 (-0.02%)

Slow pace of work noticed

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Bannu

Commissioner Bannu Division Shaukat Ali Yousafzai along with Deputy Commissioner Bannu Capt (Retd) Muhammad Zubair Khan Niazi Tuesday visited the under construction Bannu Medical College and inspected work quality and construction. Commissioner Bannu Shoukat Ali Yousafzai expressed his anguish over the slow pace of work and said, delay in work could affect students, therefore, no delay would be tolerated. He said that construction of academic and administration block should be completed as soon as possible so that students could be shifted into it. The contractor and officials of the works department were also present on the occasion and Commissioner instructed them to expedite work on the construction.—APP

Related Posts

Get Alerts