AGL37.85▼ -0.24 (-0.01%)AIRLINK142.47▲ 6.13 (0.04%)BOP9.01▼ -0.19 (-0.02%)CNERGY5.72▲ 1 (0.21%)DCL9.24▲ 0.39 (0.04%)DFML39.44▲ 1.1 (0.03%)DGKC89.31▲ 3.86 (0.05%)FCCL38.54▲ 3.39 (0.10%)FFBL77.44▲ 1.23 (0.02%)FFL13.62▲ 0.96 (0.08%)HUBC109.29▲ 0.59 (0.01%)HUMNL15.13▲ 0.4 (0.03%)KEL5.78▲ 0.2 (0.04%)KOSM8.2▲ 0.24 (0.03%)MLCF44.53▲ 3.75 (0.09%)NBP73.62▲ 2.68 (0.04%)OGDC191.76▼ -3.49 (-0.02%)PAEL27.71▲ 0.75 (0.03%)PIBTL7.99▲ 0.53 (0.07%)PPL167.17▼ -0.85 (-0.01%)PRL26.83▲ 0.64 (0.02%)PTC20.69▲ 0.35 (0.02%)SEARL97.53▲ 4.78 (0.05%)TELE8.21▲ 0.37 (0.05%)TOMCL35▼ -0.49 (-0.01%)TPLP9.9▲ 0.99 (0.11%)TREET17.35▲ 0.06 (0.00%)TRG61▲ 1.73 (0.03%)UNITY31.64▲ 0.62 (0.02%)WTL1.46▲ 0.09 (0.07%)

Murad reviews Mayo Hospital revamping

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Punjab Caretaker Minister for Transport Ibrahim Hassan Murad visited Mayo Hospital here on Wednesday and reviewed the progress of ongoing up-gradation work.
He inspected main emergency of children, basements, doctors labs on 7th floor and radiology department. He visited all floors and checked labour register for all shifts, expressed displeasure at pace of ongoing revamping work.

The authorities briefed the minister about delay in import of lifts and other equipment. Basements and ground floor (radiology department) was not handed over yet. So, the work progress at these floors was not satisfactory. The minister said that the hospital management should keep close liaison with contractors to identify proper places for fixing electric points.

Related Posts

Get Alerts