AGL38.22▲ 0.07 (0.00%)AIRLINK128.97▲ 3.9 (0.03%)BOP7.85▲ 1 (0.15%)CNERGY4.66▲ 0.21 (0.05%)DCL8.32▲ 0.41 (0.05%)DFML38.94▲ 1.6 (0.04%)DGKC81.94▲ 4.17 (0.05%)FCCL33.42▲ 2.84 (0.09%)FFBL75.71▲ 6.85 (0.10%)FFL12.82▲ 0.96 (0.08%)HUBC110.36▲ 5.86 (0.06%)HUMNL14.01▲ 0.52 (0.04%)KEL5.15▲ 0.5 (0.11%)KOSM7.67▲ 0.5 (0.07%)MLCF39.8▲ 3.36 (0.09%)NBP72.32▲ 6.4 (0.10%)OGDC188.29▲ 8.76 (0.05%)PAEL25.63▲ 1.2 (0.05%)PIBTL7.37▲ 0.22 (0.03%)PPL152.67▲ 8.97 (0.06%)PRL25.39▲ 1.07 (0.04%)PTC17.7▲ 1.3 (0.08%)SEARL82.42▲ 3.85 (0.05%)TELE7.59▲ 0.37 (0.05%)TOMCL32.57▲ 0.6 (0.02%)TPLP8.42▲ 0.29 (0.04%)TREET16.78▲ 0.65 (0.04%)TRG56.04▲ 1.38 (0.03%)UNITY28.78▲ 1.28 (0.05%)WTL1.35▲ 0.06 (0.05%)

CM Maryam directs to develop Murree on modern lines

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Chief Minister Punjab Maryam Nawaz Sharif and PML-N President Muhammad Nawaz Sharif presided over a special meeting at Punjab House Murree in which it was principally decided to rehabilitate ancient and historical buildings of Murree to their original condition.

According to a handout issued here by the DGPR, the proposal to establish a ‘Murree Street’ on the pattern of excellent street model of the world was reviewed in the meeting. It was agreed to run the latest ‘Smart Tram’ and directions were issued to submit a plan within 15 days in this regard.

CM Maryam Nawaz Sharif directed to prepare a new design of a multi storey Parking Plaza which will cater to parking capacity of more than 1500 vehicles. The tourists can visit Murree through the latest tram from the Parking Plaza. A 15-day timeline was set to install digital counting cameras on the entry routes of Murree. Murree Traffic Management Plan was approved in the meeting while Murree Cable Car Service will be linked to obtain a fitness certificate after undergoing its repair and rehabilitation.

The CM directed early completion of the upgradation project of Samli TB Sanatorium. Excellent toilets will be built for the tourists at various sites of Motorway including the Mall Road. She directed to build specific toilets for the differently-abled persons along with kids rest places. She directed to establish a wheel chair centre for the differently-abled persons and elders at the Mall Road. The proposal to establish an ‘Entertainment Park and Clipping Pod Village’ were reviewed in the meeting.

It was apprised during the briefing that more than 90 percent construction and extension of 12 roads of Murree has been completed. A water supply scheme is going to be launched for the provision of clean water in Murree and in the surrounding areas from the incumbent system and River Jhelum. The participants were apprised about elimination of encroachments and crackdown being launched against illegal constructions. A principle approval was granted to provide financial aid to the injured workers during the launching of anti-encroachment campaign. CM Maryam Nawaz Sharif said, “Anti-encroachment campaign will continue and no compromise will be made in this regard.”

President PML-N Muhammad Nawaz Sharif said, “Laws causing delay to cater to the welfare and need of general public need to be amended.

We build the Motorway and others had been discouraging us to build it. We had set a record of development projects along with elimination of terrorism and load shedding.

The Motorway being built by the Korean company did not dilapidate for 10 years and it was destroyed in the past. Those causing damage to the national assets should be held accountable.”

Related Posts

Get Alerts