AGL39.36▲ 0.65 (0.02%)AIRLINK200.9▼ -4.91 (-0.02%)BOP10.15▼ -0.09 (-0.01%)CNERGY6.88▼ -0.18 (-0.03%)DCL8.77▼ -0.03 (0.00%)DFML45.74▲ 4.16 (0.10%)DGKC102.05▲ 0.02 (0.00%)FCCL34.09▼ -0.57 (-0.02%)FFL16.98▼ -0.12 (-0.01%)HUBC131.7▲ 0.52 (0.00%)HUMNL13.76▼ -0.22 (-0.02%)KEL4.81▼ -0.1 (-0.02%)KOSM6.7▼ -0.11 (-0.02%)MLCF43.33▼ -1.01 (-0.02%)NBP62.29▲ 0.26 (0.00%)OGDC218.75▼ -3.02 (-0.01%)PAEL41.54▼ -1.15 (-0.03%)PIBTL8.65▲ 0.23 (0.03%)PPL187.12▼ -3.74 (-0.02%)PRL42.06▼ -1.43 (-0.03%)PTC24.99▲ 0.2 (0.01%)SEARL100.3▼ -2.36 (-0.02%)TELE9.11▼ -0.15 (-0.02%)TOMCL34.79▼ -0.01 (0.00%)TPLP12.93▼ -0.22 (-0.02%)TREET23.05▼ -0.42 (-0.02%)TRG68.35▼ -0.43 (-0.01%)UNITY32.66▼ -0.35 (-0.01%)WTL1.86▲ 0.06 (0.03%)

Repair work of Tharii-Ranipur section to be completed by Dec: Aleem

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Federal Minister for Communications Abdul Aleem Khan has said that the repair work of the 52 km long Tharii-Ranipur section would be completed by December 2024 at the cost of Rs 498 million. He expressed these views while responding to an attention notice in the National Assembly presented by the members of the National Assembly, Ms Nafisa Shah, Ms Naz Baloch and Ms Mehtab Akbar Rashidi, in which attention was drawn to the immediate repair of the highway as mentioned above.

Giving details of the repair work, Aleem Khan said that repairing the Tharii-Ranipur section schemes was in the procurement process and their financial bids had been opened on April 24, 2024.

Related Posts

Get Alerts