AGL40.08▲ 0.07 (0.00%)AIRLINK130.71▲ 3.71 (0.03%)BOP6.79▲ 0.1 (0.01%)CNERGY4.7▲ 0.19 (0.04%)DCL8.7▲ 0.06 (0.01%)DFML41.15▲ 0.11 (0.00%)DGKC85.89▲ 0.28 (0.00%)FCCL33.12▲ 0.01 (0.00%)FFBL66.33▲ 0.23 (0.00%)FFL11.45▼ -0.1 (-0.01%)HUBC110.85▼ -0.26 (0.00%)HUMNL14.7▼ -0.12 (-0.01%)KEL5.1▼ -0.07 (-0.01%)KOSM7.63▼ -0.03 (0.00%)MLCF40.11▼ -0.1 (0.00%)NBP61.4▲ 0.89 (0.01%)OGDC194.8▲ 0.7 (0.00%)PAEL26.75▲ 0.03 (0.00%)PIBTL7.45▲ 0.08 (0.01%)PPL155.97▲ 2.18 (0.01%)PRL27.6▲ 1.39 (0.05%)PTC18.4▲ 1.22 (0.07%)SEARL86.17▲ 0.57 (0.01%)TELE7.76▲ 0.19 (0.03%)TOMCL34.28▼ -0.11 (0.00%)TPLP9.42▲ 0.6 (0.07%)TREET16.83▲ 0.01 (0.00%)TRG62.85▲ 0.3 (0.00%)UNITY27.85▲ 0.56 (0.02%)WTL1.3▲ 0 (0.00%)

Earthbreaking of Tunneling Institute of Pakistan

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Staff Reporter

Chairman Pakistan Engineering Council (PEC) Mr Jawed Salim Qureshi carried out earthbreaking of national level Tunneling Institute of Pakistan, conceptualised by FWO at Islamabad.
Engineer-in-Chief Lieutenant General Moazzam Ejaz, HI(M), Director General FWO and officers from both PEC and FWO graced the occasion with their presence. This institute is contemplated to serve as a foundation in the fields of tunneling, aerial surveying and Building Information Modeling in the country. The building is likely to be completed by June 2021.

Related Posts

Get Alerts