A team of the Prime Minister’s Inspection Commission inspected the delayed project of installation of heating, ventilation, and air conditioning plant at Pakistan Institute of Medical Sciences on Tuesday and stressed for the completion of work before December 20.
Earlier prime minister had expressed grave concerns over the unwarranted delay in completion of the PSDP projects including “Replace and Upgradation of HVAC Plant Room Equipments and Allied Works at PIMS, Islamabad” which led to visit of PMIC’s team.
Following dissatisfaction on the reports from Ministry of Housing and Works and Ministry of National Health Services Regulations and Coordination, the matter had been referred to the PMIC for effective supervision, said a press release.
The inspection team that visited the project, comprised PMIC Member Zahir Shah and Co-opted Member Safdar Ali, Director Muhammad Saleh Narejo and Assistant Director Ahmed Waseem.
The team inspected the ongoing work of the HVAC regarding installation of the centrally air conditioning system in the whole buildings of the hospital.
PMIC Chairman Brig. (Retd) Muzaffar Ali Ranjha had assigned the task to the inquiry team headed by Zahir Shah for vigorously persuading the project and ensure its completion at the earliest.