AGL38.63▲ 0.81 (0.02%)AIRLINK129.71▼ -3.52 (-0.03%)BOP5.64▲ 0 (0.00%)CNERGY3.86▲ 0.09 (0.02%)DCL8.7▼ -0.16 (-0.02%)DFML41.9▲ 0.96 (0.02%)DGKC88.35▼ -1.34 (-0.01%)FCCL34.93▼ -0.13 (0.00%)FFBL67.02▲ 0.48 (0.01%)FFL10.57▲ 0.44 (0.04%)HUBC108.57▲ 2.01 (0.02%)HUMNL14.66▲ 1.33 (0.10%)KEL4.76▼ -0.09 (-0.02%)KOSM6.95▲ 0.15 (0.02%)MLCF41.68▲ 0.15 (0.00%)NBP59.64▲ 0.99 (0.02%)OGDC183.31▲ 2.67 (0.01%)PAEL26.23▲ 0.61 (0.02%)PIBTL5.95▲ 0.15 (0.03%)PPL147.09▼ -0.68 (0.00%)PRL23.57▲ 0.41 (0.02%)PTC16.5▲ 1.3 (0.09%)SEARL68.42▼ -0.27 (0.00%)TELE7.19▼ -0.04 (-0.01%)TOMCL35.86▼ -0.08 (0.00%)TPLP7.82▲ 0.46 (0.06%)TREET14.17▲ 0.02 (0.00%)TRG50.51▼ -0.24 (0.00%)UNITY26.76▲ 0.31 (0.01%)WTL1.21▲ 0 (0.00%)

Encroachments along the KCR route in Gulshan razed

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

In a successful anti-encroachment operation aimed at retrieving the land for restoration of KCR service in its entire loop, Pakistan Railways has eliminated hard encroachments near the Karachi University station of KCR route.

The retrieved land measures 27,000 square feet where an illegal boundary wall had been erected and construction of residential structures was undergoing.

The operation was carried out by the Railways’ Police by using heavy machinery in line with the directives of PR’s Property and Land department.

Divisional Superintendent Pakistan Railways Karachi Mr. Muhammad Hanif Gul and Project Director KCR Mr. Ameer Mohammad Daudpota felicitated the officers and staff on accomplishing the desired task.

Divisional Superintendent PR Karachi Muhammad Hanif Gul said that the operation laid basis for further anti-encroachment operations wherever required in revival of remaining 16 kilometres track of KCR loop from Orangi to Drigh Road.

“Pakistan Railways aims restoration of KCR commuter service in its old alignment as per the directives of Supreme Court of Pakistan and all human as well as material resources will be fully utilised for achieving the objective” commented the DS.

Related Posts