AGL38.15▼ -1.43 (-0.04%)AIRLINK125.07▼ -6.15 (-0.05%)BOP6.85▲ 0.04 (0.01%)CNERGY4.45▼ -0.26 (-0.06%)DCL7.91▼ -0.53 (-0.06%)DFML37.34▼ -4.13 (-0.10%)DGKC77.77▼ -4.32 (-0.05%)FCCL30.58▼ -2.52 (-0.08%)FFBL68.86▼ -4.01 (-0.06%)FFL11.86▼ -0.4 (-0.03%)HUBC104.5▼ -6.24 (-0.06%)HUMNL13.49▼ -1.02 (-0.07%)KEL4.65▼ -0.54 (-0.10%)KOSM7.17▼ -0.44 (-0.06%)MLCF36.44▼ -2.46 (-0.06%)NBP65.92▲ 1.91 (0.03%)OGDC179.53▼ -13.29 (-0.07%)PAEL24.43▼ -1.25 (-0.05%)PIBTL7.15▼ -0.19 (-0.03%)PPL143.7▼ -10.37 (-0.07%)PRL24.32▼ -1.51 (-0.06%)PTC16.4▼ -1.41 (-0.08%)SEARL78.57▼ -3.73 (-0.05%)TELE7.22▼ -0.54 (-0.07%)TOMCL31.97▼ -1.49 (-0.04%)TPLP8.13▼ -0.36 (-0.04%)TREET16.13▼ -0.49 (-0.03%)TRG54.66▼ -2.74 (-0.05%)UNITY27.5▼ -0.01 (0.00%)WTL1.29▼ -0.08 (-0.06%)

90% work on White Oil Pipeline’s dualization completed

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]
Islamabad

The Petroleum Division has ‘technically’ completed 90 per cent work on dualization of the White Oil Pipeline (WOP), from Karachi to Mehmood Kot section, for smooth supply of petrol and diesel to Oil Marketing Companies (OMCs) and reducing reliance on the traditional mode of transportation through tankers.

“Currently 90% project has been technically completed, while testing and commissioning is planned from September 2021,” a senior official privy to petroleum sector developments told APP.

The pipeline, he said, that was previously used to move only diesel from Karachi to Mehmood Kot would be transporting both diesel and petrol in batches after the dualized line was made operational.

Under the US $ 134 million project, the official said the pipeline capacity had also been increased from 8 MTPA (Million Ton per Annum) to 12 MTPA for transportation of multiproduct (High-Speed Diesel and Premier Motor Gasoline-Petrol).—APP

 

Related Posts

Get Alerts