AGL38▲ 0.01 (0.00%)AIRLINK210.38▼ -5.15 (-0.02%)BOP9.48▼ -0.32 (-0.03%)CNERGY6.48▼ -0.31 (-0.05%)DCL8.96▼ -0.21 (-0.02%)DFML38.37▼ -0.59 (-0.02%)DGKC96.92▼ -3.33 (-0.03%)FCCL36.4▼ -0.3 (-0.01%)FFL14.95▲ 0.46 (0.03%)HUBC130.69▼ -3.44 (-0.03%)HUMNL13.29▼ -0.34 (-0.02%)KEL5.5▼ -0.19 (-0.03%)KOSM6.93▼ -0.39 (-0.05%)MLCF44.78▼ -1.09 (-0.02%)NBP59.07▼ -2.21 (-0.04%)OGDC230.13▼ -2.46 (-0.01%)PAEL39.29▼ -1.44 (-0.04%)PIBTL8.31▼ -0.27 (-0.03%)PPL200.35▼ -2.99 (-0.01%)PRL38.88▼ -1.93 (-0.05%)PTC26.88▼ -1.43 (-0.05%)SEARL103.63▼ -4.88 (-0.04%)TELE8.45▼ -0.29 (-0.03%)TOMCL35.25▼ -0.58 (-0.02%)TPLP13.52▼ -0.32 (-0.02%)TREET25.01▲ 0.63 (0.03%)TRG64.12▲ 2.97 (0.05%)UNITY34.52▼ -0.32 (-0.01%)WTL1.78▲ 0.06 (0.03%)

Resolving masses’ problems top priority

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Special Assistant to the Prime Minister (SAPM) on Political Affairs Malik Amir Dogar Sunday said that resolving masses’ problems at their doorsteps was top priority of the government and steps were being taken in that regard.

Malik Amir Dogar expressed these views while addressing an open court held at UC 24 NA-155 constituency for redressal of masses problems.

He said that millions of rupee funds have been fixed to resolve WASA related issues including sewerage and others in the UC. He said that construction of disposal station in this area was old demand and added that it would be built at a cost of Rs 22 million from MNA funds.

The drainage issues of low lying areas of the area would be resolved through construction of disposal station. Likewise, work was underway for construction of streets, installation of pipelines.—APP

Related Posts

Get Alerts