Staff Reporter
The M9 Motorway between Karachi and Hyderabad is getting potholes and it is likely
because of heavy vehicles. Overloaded vehicles have been plying on the road. Twenty-wheeler trailers
that are allowed to carry 60 tonnes of goods are taking between 100 and 120 tonnes, overloading their
vehicles and resulting in a heavier-than-allowed load on the roads.The media team visited the road few
days back and it was witnessed how it has curved in various sections.