AGL40.21▲ 0.18 (0.00%)AIRLINK127.64▼ -0.06 (0.00%)BOP6.67▲ 0.06 (0.01%)CNERGY4.45▼ -0.15 (-0.03%)DCL8.73▼ -0.06 (-0.01%)DFML41.16▼ -0.42 (-0.01%)DGKC86.11▲ 0.32 (0.00%)FCCL32.56▲ 0.07 (0.00%)FFBL64.38▲ 0.35 (0.01%)FFL11.61▲ 1.06 (0.10%)HUBC112.46▲ 1.69 (0.02%)HUMNL14.81▼ -0.26 (-0.02%)KEL5.04▲ 0.16 (0.03%)KOSM7.36▼ -0.09 (-0.01%)MLCF40.33▼ -0.19 (0.00%)NBP61.08▲ 0.03 (0.00%)OGDC194.18▼ -0.69 (0.00%)PAEL26.91▼ -0.6 (-0.02%)PIBTL7.28▼ -0.53 (-0.07%)PPL152.68▲ 0.15 (0.00%)PRL26.22▼ -0.36 (-0.01%)PTC16.14▼ -0.12 (-0.01%)SEARL85.7▲ 1.56 (0.02%)TELE7.67▼ -0.29 (-0.04%)TOMCL36.47▼ -0.13 (0.00%)TPLP8.79▲ 0.13 (0.02%)TREET16.84▼ -0.82 (-0.05%)TRG62.74▲ 4.12 (0.07%)UNITY28.2▲ 1.34 (0.05%)WTL1.34▼ -0.04 (-0.03%)

Repair work at Dhabeji pumping station completed, water supply to resume soon

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

 

The repair work on the 72-inch MS Line No. 5 at Dhabeji Pumping Station has been completed. However, the water supply has not yet resumed due to a cable fault in phases two and three, reported K-Electric. According to the spokesperson, water from Line No. 5 is still not being supplied due to the cable fault. The supply will return to normal as soon as the fault is repaired. Additionally, work on the repair of the 72-inch PRCC Line No. 1 is ongoing. The spokesperson stated that this repair work will be completed within the next four days. It is important to note that an unexpected power outage yesterday caused ruptures in both the 72-inch MS Line No. 5 and the 72-inch PRCC Line No. 1, prompting the need for repair efforts.

Related Posts

© 2024 All rights reserved | Pakistan Observer