AGL38▲ 0.01 (0.00%)AIRLINK210.38▼ -5.15 (-0.02%)BOP9.48▼ -0.32 (-0.03%)CNERGY6.48▼ -0.31 (-0.05%)DCL8.96▼ -0.21 (-0.02%)DFML38.37▼ -0.59 (-0.02%)DGKC96.92▼ -3.33 (-0.03%)FCCL36.4▼ -0.3 (-0.01%)FFL14.95▲ 0.46 (0.03%)HUBC130.69▼ -3.44 (-0.03%)HUMNL13.29▼ -0.34 (-0.02%)KEL5.5▼ -0.19 (-0.03%)KOSM6.93▼ -0.39 (-0.05%)MLCF44.78▼ -1.09 (-0.02%)NBP59.07▼ -2.21 (-0.04%)OGDC230.13▼ -2.46 (-0.01%)PAEL39.29▼ -1.44 (-0.04%)PIBTL8.31▼ -0.27 (-0.03%)PPL200.35▼ -2.99 (-0.01%)PRL38.88▼ -1.93 (-0.05%)PTC26.88▼ -1.43 (-0.05%)SEARL103.63▼ -4.88 (-0.04%)TELE8.45▼ -0.29 (-0.03%)TOMCL35.25▼ -0.58 (-0.02%)TPLP13.52▼ -0.32 (-0.02%)TREET25.01▲ 0.63 (0.03%)TRG64.12▲ 2.97 (0.05%)UNITY34.52▼ -0.32 (-0.01%)WTL1.78▲ 0.06 (0.03%)

PM inaugurates 1,650 MW coal-fired power plants in Thar

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Says no one will be allowed to support terrorists; Foresees economic boom for Thar Desert

Prime Minister Shehbaz Sharif on Wednesday inaugurated two coal-fired power plants in Tharparker with a capacity of 1,650 megawatts of electricity generation, saying that the projects would turn the desert into an “economic hub”.

The projects, including the 1,320MW Shanghai Electric power plant and 330MW Thal Nova power plant, will annually generate 11.24 billion units of

low-cost electricity. Through the direct investment of $3.53bn into these projects, the production of coal-based electricity in Thar will increase up to 3,300MW.

Addressing the launch event at Thar’s Islamkot area, the prime minister said it was a “moment of celebration” for the country that the Tharparkar desert was getting a “source of basic facilities for life”.

He dismissed the criticism by certain people against Thar’s coal, terming it a blessing with immense potential for power resources that needed to be untapped.

“The journey of progress will spread across the country and will strengthen the national economy,” PM Shehbaz said, adding that projects which were abandoned during the last four years were being made operational again.

Shehbaz said that by April 30, power turbines would be installed at the projects to generate electricity, which would be supplied to the rest of the country through transmission lines.
He expressed gratitude to the Chinese government for extending support to Pakistan in carrying out development projects under the China-Pakistan Economic Corridor.

PM Shehbaz vowed that the coalition government would put in all efforts to materialise CPEC projects, with the agriculture sector as its next phase.

The prime minister also announced a hospital for the people of Tharparkar to provide them with medical facilities at their doorsteps.

PM Shehbaz also condemned Tuesday’s terrorist incident that targeted military personnel and said the “malicious agenda” of the nation’s enemies would be foiled.

“No one is above the law and will not be allowed to support terrorists and use them as shields.”

 

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer