AGL46.6▲ 3.06 (0.07%)AIRLINK196.16▲ 1.33 (0.01%)BOP9.84▲ 0.03 (0.00%)CNERGY7.5▲ 0.14 (0.02%)DCL9.41▲ 0.21 (0.02%)DFML44.46▲ 2.58 (0.06%)DGKC109.74▲ 1.95 (0.02%)FCCL40.31▲ 1.73 (0.04%)FFL16.54▲ 0.09 (0.01%)HUBC133.25▲ 1.5 (0.01%)HUMNL13.94▲ 0.08 (0.01%)KEL4.62▼ -0.04 (-0.01%)KOSM6.6▼ -0.06 (-0.01%)MLCF47▲ 1.61 (0.04%)NBP61.7▲ 1.28 (0.02%)OGDC217.51▲ 3.52 (0.02%)PAEL40.6▲ 0.54 (0.01%)PIBTL8.4▲ 0.08 (0.01%)PPL185▲ 2.81 (0.02%)PRL42.49▲ 0.66 (0.02%)PTC24.99▲ 0.43 (0.02%)SEARL106▲ 3.47 (0.03%)TELE8.81▲ 0.05 (0.01%)TOMCL34.4▲ 0.26 (0.01%)TPLP12.86▲ 0.11 (0.01%)TREET21.55▼ -0.13 (-0.01%)TRG66.2▲ 0.8 (0.01%)UNITY32.5▲ 0.09 (0.00%)WTL1.71▲ 0.01 (0.01%)

Govt planning to switch domestic users over to solar energy: Dastagir

solar energy
Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Islamabad: Federal Minister for Power and Energy Khurram Dastagir said that the government was planning to switch domestic users over to solar energy, and “a comprehensive strategy [was] being devised” in this regard.

Speaking at a press conference in Gujranwala, the federal minister said that all public buildings and infrastructures are also being switched over to solar energy in a phased manner.

He also said that the government is taking measures to make dysfunctional power plants functional to overcome the issue of load-shedding in the country.

Regarding the power generation plants in the country, the minister said that the 720-megawatt Karot power plant started power generation, and water inflow in Tarbela Dam increased significantly over the last three days, which resulted in additional 600-megawatt electricity.

Read: Biodiversity and Karot Hydropower Project | By Dr Nowsharwan

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer