AGL37.9▲ 0.08 (0.00%)AIRLINK131.56▼ -1.67 (-0.01%)BOP5.61▼ -0.03 (-0.01%)CNERGY3.79▲ 0.02 (0.01%)DCL8.68▼ -0.18 (-0.02%)DFML40.95▲ 0.01 (0.00%)DGKC88.5▼ -1.19 (-0.01%)FCCL35.25▲ 0.19 (0.01%)FFBL66.2▼ -0.34 (-0.01%)FFL10.37▲ 0.24 (0.02%)HUBC109.2▲ 2.64 (0.02%)HUMNL14.24▲ 0.91 (0.07%)KEL4.87▲ 0.02 (0.00%)KOSM7.01▲ 0.21 (0.03%)MLCF42.01▲ 0.48 (0.01%)NBP59.71▲ 1.06 (0.02%)OGDC184.8▲ 4.16 (0.02%)PAEL25.58▼ -0.04 (0.00%)PIBTL5.86▲ 0.06 (0.01%)PPL147.7▼ -0.07 (0.00%)PRL23▼ -0.16 (-0.01%)PTC16.34▲ 1.14 (0.08%)SEARL68.2▼ -0.49 (-0.01%)TELE7.26▲ 0.03 (0.00%)TOMCL35.75▼ -0.19 (-0.01%)TPLP7.52▲ 0.16 (0.02%)TREET14.2▲ 0.05 (0.00%)TRG50.87▲ 0.12 (0.00%)UNITY26.55▲ 0.1 (0.00%)WTL1.21▲ 0 (0.00%)

Govt planning to switch domestic users over to solar energy: Dastagir

solar energy
Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Islamabad: Federal Minister for Power and Energy Khurram Dastagir said that the government was planning to switch domestic users over to solar energy, and “a comprehensive strategy [was] being devised” in this regard.

Speaking at a press conference in Gujranwala, the federal minister said that all public buildings and infrastructures are also being switched over to solar energy in a phased manner.

He also said that the government is taking measures to make dysfunctional power plants functional to overcome the issue of load-shedding in the country.

Regarding the power generation plants in the country, the minister said that the 720-megawatt Karot power plant started power generation, and water inflow in Tarbela Dam increased significantly over the last three days, which resulted in additional 600-megawatt electricity.

Read: Biodiversity and Karot Hydropower Project | By Dr Nowsharwan

Related Posts