AGL43.54▼ -1.75 (-0.04%)AIRLINK194.83▼ -3.14 (-0.02%)BOP9.81▼ -0.23 (-0.02%)CNERGY7.36▲ 0.07 (0.01%)DCL9.2▲ 0.11 (0.01%)DFML41.88▼ -3.84 (-0.08%)DGKC107.79▲ 2.23 (0.02%)FCCL38.58▲ 2.58 (0.07%)FFL16.45▼ -0.46 (-0.03%)HUBC131.75▼ -2.28 (-0.02%)HUMNL13.86▼ -0.28 (-0.02%)KEL4.66▼ -0.12 (-0.03%)KOSM6.66▼ -0.28 (-0.04%)MLCF45.39▲ 0.41 (0.01%)NBP60.42▼ -0.74 (-0.01%)OGDC213.99▼ -4.24 (-0.02%)PAEL40.06▼ -1.36 (-0.03%)PIBTL8.32▼ -0.14 (-0.02%)PPL182.19▼ -3.74 (-0.02%)PRL41.83▲ 0.56 (0.01%)PTC24.56▼ -0.21 (-0.01%)SEARL102.53▼ -2.12 (-0.02%)TELE8.76▼ -0.15 (-0.02%)TOMCL34.14▼ -0.52 (-0.02%)TPLP12.75▼ -0.09 (-0.01%)TREET21.68▼ -1.08 (-0.05%)TRG65.4▼ -1.2 (-0.02%)UNITY32.41▼ -0.53 (-0.02%)WTL1.7▼ -0.08 (-0.04%)

Construction of 3.73 MW solar power project completed

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

 

The Reon Energy Limited on Monday announced the completion of its’ 3.73 MW captive Solar Power Project for G&T Group in Karachi. The Solar Photovoltaic Plant is the largest bi-facial PV rooftops in the country.

The 3.73 MW Photovoltaic Project is expected to produce approximately 6,152 MWh (Megawatt hours) annually. The project is dispersed across 4-locations including Gatron at Hub, Mustaqim Dyeing and Printing at SITE and Nooriabad and Novatex at Landhi.

The output energy will be used on-site, reducing gas consumption, and avoiding around 3780 Tonnes of CO2 equivalent emissions during the plant life. Bi-facial solar modules applied at G&T, that can absorb sunlight from both faces- front and back, have significantly improved energy production by up to 10%.

The project ensured strict compliance with COVID-19 protocols during execution. A total of 80 jobs were created for the locals during execution.

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer