AGL38.22▲ 0.07 (0.00%)AIRLINK128.97▲ 3.9 (0.03%)BOP7.85▲ 1 (0.15%)CNERGY4.66▲ 0.21 (0.05%)DCL8.32▲ 0.41 (0.05%)DFML38.94▲ 1.6 (0.04%)DGKC81.94▲ 4.17 (0.05%)FCCL33.42▲ 2.84 (0.09%)FFBL75.71▲ 6.85 (0.10%)FFL12.82▲ 0.96 (0.08%)HUBC110.36▲ 5.86 (0.06%)HUMNL14.01▲ 0.52 (0.04%)KEL5.15▲ 0.5 (0.11%)KOSM7.67▲ 0.5 (0.07%)MLCF39.8▲ 3.36 (0.09%)NBP72.32▲ 6.4 (0.10%)OGDC188.29▲ 8.76 (0.05%)PAEL25.63▲ 1.2 (0.05%)PIBTL7.37▲ 0.22 (0.03%)PPL152.67▲ 8.97 (0.06%)PRL25.39▲ 1.07 (0.04%)PTC17.7▲ 1.3 (0.08%)SEARL82.42▲ 3.85 (0.05%)TELE7.59▲ 0.37 (0.05%)TOMCL32.57▲ 0.6 (0.02%)TPLP8.42▲ 0.29 (0.04%)TREET16.78▲ 0.65 (0.04%)TRG56.04▲ 1.38 (0.03%)UNITY28.78▲ 1.28 (0.05%)WTL1.35▲ 0.06 (0.05%)

PHE wants speedy completion of drinking water schemes

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Staff Reporter

Peshawar

Special Assistant to KP CM on Public Health Engineering (PHE) Riaz Khan has directed regular testing of drinking water and cleaning of water tanks. He issued these directives during a briefing on drinking water schemes in Mardan, Swat and Malakand circles and performance of the PHE Department here Wednesday. Besides, Secretary PHE Department, Engineer Bahramand Khan and Chief Engineer Abdul Sami, the superintendent engineers of all concerned circles attended the briefing.
The special assistant directed the registration of all illegal connections and recovery of revenue within the period of two months and informing him of progress in that connection. He further directed that no employee should be granted concession over absence without genuine cause and acceptance of no political pressure in posting and transfers.

Related Posts

Get Alerts