AGL47▲ 3.84 (0.09%)AIRLINK202.7▲ 1.46 (0.01%)BOP10.11▲ 0.14 (0.01%)CNERGY6.94▲ 0.05 (0.01%)DCL9.35▲ 0.35 (0.04%)DFML49.51▼ -0.72 (-0.01%)DGKC108.25▲ 1.29 (0.01%)FCCL36.61▲ 1.25 (0.04%)FFL17.2▲ 0.05 (0.00%)HUBC136.6▼ -1.59 (-0.01%)HUMNL14.22▲ 0.15 (0.01%)KEL4.88▲ 0.02 (0.00%)KOSM6.6▼ -0.06 (-0.01%)MLCF46.49▲ 0.18 (0.00%)NBP61.65▲ 0.01 (0.00%)OGDC224.24▲ 1.7 (0.01%)PAEL42.88▼ -0.26 (-0.01%)PIBTL8.6▲ 0.06 (0.01%)PPL189.71▲ 0.95 (0.01%)PRL43.3▲ 0.03 (0.00%)PTC25.55▲ 0.2 (0.01%)SEARL110.36▼ -0.06 (0.00%)TELE9.18▲ 0.06 (0.01%)TOMCL34.89▲ 0.12 (0.00%)TPLP13.62▼ -0.06 (0.00%)TREET23.91▼ -0.04 (0.00%)TRG68.15▼ -0.01 (0.00%)UNITY33.33▲ 0.08 (0.00%)WTL1.88▲ 0.01 (0.01%)

Power supply restored at Dhabeji, KE ensures uninterrupted service

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

 

K-Electric (KE) has successfully restored power to the Dhabeji Pumping Station following a minor disruption. The issue has been swiftly resolved, and the power supply has been fully restored to ensure stable and uninterrupted service. All major pumping stations, including Dhabeji, under the KW&SB, are exempt from loadshedding. In case of emergencies, KE utilizes alternative power sources to maintain an uninterrupted supply, ensuring no disruption to critical water services. KE’s teams remain in constant communication with KW&SB representatives, ready to address any potential issues promptly, further ensuring the continuity of services without affecting residents.

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer