Karachi Load Shedding Schedule for August 7

Karachi Load Shedding Schedule For August 7

For Karachiites, Friday could start with an unexpected disturbance as several neighborhoods will see electricity load shedding amid citywide maintenance drive.

K-Electric shared an update on temporary shutdowns, which are part of scheduled maintenance aimed at improving the reliability and performance of Karachi’s electricity distribution network. Depending on the feeder, power cuts will begin as early as 8:30am and, in some locations, continue until 8:00pm.

August 7 Load-Shedding Schedule

Area / Feeder Timing
51-C Area 9:00am – 6:00pm
Airport Telephone Exchange 9:00am – 6:00pm
Aleemabad 9:00am – 6:00pm
Block-5 RMU 9:00am – 6:00pm
Dawat-e-Hidayat (Old Saifee Foundation) 9:00am – 6:00pm
Deh Landhi 9:00am – 6:00pm
Ejaz Ansari RMU 9:00am – 6:00pm
Federal Government Employees Housing Foundation 9:00am – 6:00pm
Ghaniabad RMU 9:00am – 6:00pm
Gulbahar 9:00am – 6:00pm
Harmain Builders 9:00am – 6:00pm
Kathiawar Society 9:00am – 6:00pm
Lashari Goth 9:00am – 6:00pm
Naz Ice 9:00am – 6:00pm
Nisar Shaheed Park 9:00am – 6:00pm
Plastic Crafter (Universal Tex.) 9:00am – 6:00pm
Sallu Garden 9:00am – 6:00pm
Shaez Residency 9:00am – 6:00pm
Talha Cottages 9:00am – 6:00pm
Uni Gold RMU 9:00am – 6:00pm
UBL Sports 9:00am – 6:00pm
Eid Gah RMU 8:30am – 6:00pm
Baray Wala RMU 10:00am – 5:00pm*
Mehran Bottler 9:00am – 5:00pm*
Sadiq Re-Rolling 10:00am – 5:00pm*
Uthal Bazar 9:00am – 5:00pm*
Asim RMU 10:00am – 8:00pm
Raja Traders 10:00am – 8:00pm
Saffron Engineering 9:00am – 7:00pm
Pole-20 9:00am – 5:30pm
International Ceramic 10:00am – 2:00pm
Poly Trade 10:00am – 6:00pm
Sector-D S/S-3 10:00am – 6:00pm

A large number of areas will remain without electricity from 9:00am to 6:00pm, including 51-C Area, Airport Telephone Exchange, Aleemabad, Block-5 RMU, Dawat-e-Hidayat (Old Saifee Foundation), Deh Landhi, Ejaz Ansari RMU, Federal Government Employees Housing Foundation, Ghaniabad RMU, Gulbahar, Harmain Builders, Kathiawar Society, Lashari Goth, Naz Ice, Nisar Shaheed Park, Plastic Crafter (Universal Tex.), Sallu Garden, Shaez Residency, Talha Cottages, Uni Gold RMU, and UBL Sports.

Meanwhile, Eid Gah RMU will remain without electricity from 8:30am to 6:00pm. Power supply to Baray Wala RMU, Mehran Bottler, Sadiq Re-Rolling, and Uthal Bazar will be suspended from either 9:00am or 10:00am until 5:00pm, depending on the feeder schedule.

Some consumers will experience even longer outages. Asim RMU and Raja Traders are scheduled for a 10-hour shutdown from 10:00am to 8:00pm, while Saffron Engineering will remain without electricity from 9:00am to 7:00pm. Pole-20 will undergo maintenance from 9:00am to 5:30pm, International Ceramic will face a shorter outage between 10:00am and 2:00pm, and Poly Trade along with Sector-D S/S-3 will experience power interruptions from 10:00am to 6:00pm.

Lahore electricity loadshedding schedule today as shortfall widens

Get Alerts