K-Electric shared an update on temporary shutdowns, which are part of scheduled maintenance aimed at improving the reliability and performance of Karachi’s electricity distribution network. Depending on the feeder, power cuts will begin as early as 8:30am and, in some locations, continue until 8:00pm.
August 7 Load-Shedding Schedule
| Area / Feeder | Timing |
|---|---|
| 51-C Area | 9:00am – 6:00pm |
| Airport Telephone Exchange | 9:00am – 6:00pm |
| Aleemabad | 9:00am – 6:00pm |
| Block-5 RMU | 9:00am – 6:00pm |
| Dawat-e-Hidayat (Old Saifee Foundation) | 9:00am – 6:00pm |
| Deh Landhi | 9:00am – 6:00pm |
| Ejaz Ansari RMU | 9:00am – 6:00pm |
| Federal Government Employees Housing Foundation | 9:00am – 6:00pm |
| Ghaniabad RMU | 9:00am – 6:00pm |
| Gulbahar | 9:00am – 6:00pm |
| Harmain Builders | 9:00am – 6:00pm |
| Kathiawar Society | 9:00am – 6:00pm |
| Lashari Goth | 9:00am – 6:00pm |
| Naz Ice | 9:00am – 6:00pm |
| Nisar Shaheed Park | 9:00am – 6:00pm |
| Plastic Crafter (Universal Tex.) | 9:00am – 6:00pm |
| Sallu Garden | 9:00am – 6:00pm |
| Shaez Residency | 9:00am – 6:00pm |
| Talha Cottages | 9:00am – 6:00pm |
| Uni Gold RMU | 9:00am – 6:00pm |
| UBL Sports | 9:00am – 6:00pm |
| Eid Gah RMU | 8:30am – 6:00pm |
| Baray Wala RMU | 10:00am – 5:00pm* |
| Mehran Bottler | 9:00am – 5:00pm* |
| Sadiq Re-Rolling | 10:00am – 5:00pm* |
| Uthal Bazar | 9:00am – 5:00pm* |
| Asim RMU | 10:00am – 8:00pm |
| Raja Traders | 10:00am – 8:00pm |
| Saffron Engineering | 9:00am – 7:00pm |
| Pole-20 | 9:00am – 5:30pm |
| International Ceramic | 10:00am – 2:00pm |
| Poly Trade | 10:00am – 6:00pm |
| Sector-D S/S-3 | 10:00am – 6:00pm |
A large number of areas will remain without electricity from 9:00am to 6:00pm, including 51-C Area, Airport Telephone Exchange, Aleemabad, Block-5 RMU, Dawat-e-Hidayat (Old Saifee Foundation), Deh Landhi, Ejaz Ansari RMU, Federal Government Employees Housing Foundation, Ghaniabad RMU, Gulbahar, Harmain Builders, Kathiawar Society, Lashari Goth, Naz Ice, Nisar Shaheed Park, Plastic Crafter (Universal Tex.), Sallu Garden, Shaez Residency, Talha Cottages, Uni Gold RMU, and UBL Sports.
Meanwhile, Eid Gah RMU will remain without electricity from 8:30am to 6:00pm. Power supply to Baray Wala RMU, Mehran Bottler, Sadiq Re-Rolling, and Uthal Bazar will be suspended from either 9:00am or 10:00am until 5:00pm, depending on the feeder schedule.
Some consumers will experience even longer outages. Asim RMU and Raja Traders are scheduled for a 10-hour shutdown from 10:00am to 8:00pm, while Saffron Engineering will remain without electricity from 9:00am to 7:00pm. Pole-20 will undergo maintenance from 9:00am to 5:30pm, International Ceramic will face a shorter outage between 10:00am and 2:00pm, and Poly Trade along with Sector-D S/S-3 will experience power interruptions from 10:00am to 6:00pm.
Lahore electricity loadshedding schedule today as shortfall widens
