AGL40▲ 0 (0.00%)AIRLINK129.06▼ -0.47 (0.00%)BOP6.75▲ 0.07 (0.01%)CNERGY4.49▼ -0.14 (-0.03%)DCL8.55▼ -0.39 (-0.04%)DFML40.82▼ -0.87 (-0.02%)DGKC80.96▼ -2.81 (-0.03%)FCCL32.77▲ 0 (0.00%)FFBL74.43▼ -1.04 (-0.01%)FFL11.74▲ 0.27 (0.02%)HUBC109.58▼ -0.97 (-0.01%)HUMNL13.75▼ -0.81 (-0.06%)KEL5.31▼ -0.08 (-0.01%)KOSM7.72▼ -0.68 (-0.08%)MLCF38.6▼ -1.19 (-0.03%)NBP63.51▲ 3.22 (0.05%)OGDC194.69▼ -4.97 (-0.02%)PAEL25.71▼ -0.94 (-0.04%)PIBTL7.39▼ -0.27 (-0.04%)PPL155.45▼ -2.47 (-0.02%)PRL25.79▼ -0.94 (-0.04%)PTC17.5▼ -0.96 (-0.05%)SEARL78.65▼ -3.79 (-0.05%)TELE7.86▼ -0.45 (-0.05%)TOMCL33.73▼ -0.78 (-0.02%)TPLP8.4▼ -0.66 (-0.07%)TREET16.27▼ -1.2 (-0.07%)TRG58.22▼ -3.1 (-0.05%)UNITY27.49▲ 0.06 (0.00%)WTL1.39▲ 0.01 (0.01%)

CDA delegation visits PV project in China for green energy cooperation

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

A delegation of Capital Development Authority (CDA) visited this week the Wansheng 20 MW rooftop distributed photovoltaic power generation project in Chongqing China, Gwadar Pro reported on Friday.

The project is constructed by PowerChina Chongqing Engineering Cooperation. General Manager of Overseas Business Division of the company, TuYongguo, led the delegation touring the key facilities, including the rooftop photovoltaic array, inverter operations and the prefab equipment cabin.

This provided them with valuable insights into the practical application, benefits, and the process of sustainable power supply in the rooftop distributed photovoltaic system.

Imran Muhammad, head of the delegation, lauded the project and emphasized green energy’s significance in reducing carbon emissions and addressing energy scarcity issues.

With an annual electricity generation capacity of 14 million kilowatt-hours, the project is equivalent to save 40 million tons of standard coal and reducing carbon dioxide emissions by 90 million tons.

Related Posts

Get Alerts