AGL40.03▲ 0.02 (0.00%)AIRLINK129.31▲ 2.31 (0.02%)BOP6.8▲ 0.11 (0.02%)CNERGY4.64▲ 0.13 (0.03%)DCL8.63▼ -0.01 (0.00%)DFML40.95▼ -0.09 (0.00%)DGKC85.74▲ 0.13 (0.00%)FCCL33▼ -0.11 (0.00%)FFBL66.53▲ 0.43 (0.01%)FFL11.46▼ -0.09 (-0.01%)HUBC110.58▼ -0.53 (0.00%)HUMNL14.63▼ -0.19 (-0.01%)KEL5.24▲ 0.07 (0.01%)KOSM8.11▲ 0.45 (0.06%)MLCF40.07▼ -0.14 (0.00%)NBP60.51▲ 0 (0.00%)OGDC195.47▲ 1.37 (0.01%)PAEL27.1▲ 0.38 (0.01%)PIBTL7.64▲ 0.27 (0.04%)PPL155.82▲ 2.03 (0.01%)PRL27.37▲ 1.16 (0.04%)PTC18.56▲ 1.38 (0.08%)SEARL85.1▼ -0.5 (-0.01%)TELE7.9▲ 0.33 (0.04%)TOMCL34.88▲ 0.49 (0.01%)TPLP9.22▲ 0.4 (0.05%)TREET16.81▼ -0.01 (0.00%)TRG62.86▲ 0.31 (0.00%)UNITY27.75▲ 0.46 (0.02%)WTL1.3▲ 0 (0.00%)

Work on Thar Block 2 power plants in full swing: Asim

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

OBSERVER REPORTER IS LAMABAD Special Assi stant to the Prime Minister on Information and Broadcasting Lt Gen (retd) Asim Saleem Bajwa on Friday said the work on the 330 MW Thar Block-2 MW power plant was in full swing. Asim Bajwa, who is also CPEC Authority chairman, in a tweet, the work that was being executed by Thar Energy Limited and HUBCO, was unaffected by COVID-19. The project had brought an investment of US$500 million and created 805 local direct jobs, he aid, adding its financial close was done on January 31, 2020.\932

Related Posts

Get Alerts