AGL40.01▼ -0.01 (0.00%)AIRLINK187.98▲ 9.91 (0.06%)BOP10.12▲ 0.16 (0.02%)CNERGY7.11▲ 0.17 (0.02%)DCL10.15▲ 0.06 (0.01%)DFML41.57▲ 0 (0.00%)DGKC107.91▲ 1.02 (0.01%)FCCL39▼ -0.03 (0.00%)FFBL82.02▲ 0.13 (0.00%)FFL14.9▲ 1.2 (0.09%)HUBC119.46▲ 0.21 (0.00%)HUMNL14.05▲ 0.05 (0.00%)KEL6.4▲ 0.49 (0.08%)KOSM8.07▲ 0.01 (0.00%)MLCF49.47▲ 1.37 (0.03%)NBP73.66▲ 0.83 (0.01%)OGDC204.85▲ 11.09 (0.06%)PAEL33.56▲ 1.41 (0.04%)PIBTL8.07▲ 0.05 (0.01%)PPL185.41▲ 11.34 (0.07%)PRL33.61▲ 1.01 (0.03%)PTC27.39▲ 2.12 (0.08%)SEARL119.82▼ -5.14 (-0.04%)TELE9.69▲ 0.27 (0.03%)TOMCL35.3▼ -0.09 (0.00%)TPLP12.25▲ 0.63 (0.05%)TREET20.26▲ 1.84 (0.10%)TRG60.78▲ 0.29 (0.00%)UNITY37.99▼ -0.22 (-0.01%)WTL1.65▼ -0.01 (-0.01%)

PM Shehbaz’ keen interest in Gwadar, CPEC brings new life to port city’s projects

Pakistan floods
Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Soon after assuming office, Prime Minister Shehbaz Sharif took keen interest in the development of Gwadar and personally visited the port city last year, where he announced a 100 billion development package for the Balochistan province with a sizable amount fixed for the city besides inaugurating some key infrastructure projects including Eastbay Expressway.

During his visit to the city in June last year, the prime minister ordered to complete all the ongoing development projects of water, electricity and infrastructure in Gwadar in the stipulated time.

He warned of zero tolerance on any further interruption in the projects of water and electricity saying that the 1.2 million gallons of desalination plant in Gwadar should be completed as soon as possible.

PM Shehbaz said the network of pipelines for the provision of water in houses should be immediately improved and also ordered an inquiry to identify those responsible for delaying the projects.

Shehbaz directed the relevant authorities to begin dredging at the Gwadar port besides taking practical steps for breakwater.—APP

 

Related Posts

Get Alerts