AGL39.71▼ -0.42 (-0.01%)AIRLINK189.85▲ 0.42 (0.00%)BOP9.83▼ -0.51 (-0.05%)CNERGY7.01▼ -0.2 (-0.03%)DCL10.24▲ 0.03 (0.00%)DFML41.31▼ -0.49 (-0.01%)DGKC105.99▼ -2.64 (-0.02%)FCCL37.72▼ -0.87 (-0.02%)FFBL93.41▲ 3.5 (0.04%)FFL15▼ -0.02 (0.00%)HUBC122.3▼ -0.93 (-0.01%)HUMNL14.31▼ -0.14 (-0.01%)KEL6.32▼ -0.02 (0.00%)KOSM8.12▼ -0.28 (-0.03%)MLCF48.78▼ -0.69 (-0.01%)NBP72.31▼ -2.51 (-0.03%)OGDC222.95▲ 9.54 (0.04%)PAEL33.62▲ 0.63 (0.02%)PIBTL9.67▲ 0.6 (0.07%)PPL201.45▲ 1.52 (0.01%)PRL33.8▼ -0.75 (-0.02%)PTC26.59▼ -0.62 (-0.02%)SEARL116.87▼ -1.32 (-0.01%)TELE9.63▼ -0.25 (-0.03%)TOMCL36.61▲ 1.19 (0.03%)TPLP11.95▼ -0.62 (-0.05%)TREET24.49▲ 2.2 (0.10%)TRG61.36▲ 0.46 (0.01%)UNITY36.06▼ -0.63 (-0.02%)WTL1.79▲ 0 (0.00%)

Punjab CM early morning visit to Lahore Ring Road Southern Loop-3

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

“Complete SL-3 project at the earliest,” said Punjab Chief Minister Maryam Nawaz Sharif during her early morning visit to Lahore Ring Road Southern Loop-3 Project.

She also directed the authorities concerned to take necessary steps for the construction of Ring Road SL4. SL-4 will be constructed from Maraka to Sharqpur Interchange M3.

Chief Minister Maryam Nawaz Sharif visited the entire Ring Road from Ada Plot to Maraka Multan Road. She said,”Ring Road Southern Loop-3 will make it easier for the public to travel.” She directed to plant local saplings at Lahore Ring Road Interchange on Multan Road.

Earlier, Madam Chief Minister was briefed that both sides of Lahore Ring Road Southern Loop-3 are 8.8 kilometers long. Traffic coming from South Punjab will be able to reach destination without passing through the city.

Provincial Minister for C&W Sohaib Ahmed Malik, Former Senator Pervaiz Rashid, Chief Secretary, Secretary C&W, Commissioner, FWO authorities and other relevant officers were present at the venue.

Related Posts

Get Alerts