Amraiz Khan
A delegation comprising members of the Punjab Assembly from Rawalpindi including adviser Asif Mehmood, Maj (r) Muhammad Latasab Satti, Raja Saghir Ahmed, Javed Kausar, Ch. Sajid Mehmood, Wasiq Qayyum Abbasi, Malik Taimoor, Amjad Mehmood Ch, Umer Tanvir and Chief Whip in Punjab Assembly Syed Abbas Ali Shah met Punjab Chief Minister Sardar Usman Buzdar at CM’s House here. They discussed issues of their constituencies with the chief minister.
On the occasion, the chief minister issued immediate instructions for early resolve to the problems being faced by the people. The MPAs thanked the CM for his cooperation and said the people of Rawalpindi are siding with the PTI.
The CM reiterated the respect of the parliamentarians is very dear to him and vowed that work will be done on a priority basis in the areas of public representatives. He disclosed that a separate development package is being devised for every city including Rawalpindi and added that he will soon visit Rawalpindi to review progress made on development schemes. The Rawalpindi Ring Road project will ease the movement of the locals and equal development work will be done in every constituency, he continued. The CM pledged to accelerate the public welfare agenda under the leadership of PM Imran Khan and declared that every conspiracy of opponents of development will be frustrated.
The critics should look into their own peep and the government will continue to respond to the negative politics of the propagandists with a public welfare agenda, concluded the CM.
Meanwhile, Chief Minister Usman Buzdar sought a report from the Lahore CCPO about rape-cum-murder of a maid in Iqbal Town. He directed for early arrest the perpetrators of the crime. The heirs will be provided justice; the CM assured and extended sympathies to them.
The chief minister also took notice of news aired at a private news channel about the unavailability of a bridge for the residents of Wachla Bella locality over Jhelum River and sought a report from secretary C&W with the direction to early complete the feasibility report for the construction of a bridge there.