NEPRA has instructed K-Electric not to carry out loadshedding during night time. K-Electric has admitted loadshedding in Karachi upto 9 hours. According to details, NEPRA, while concluding the hearing on the request of K-Electric to increase the price of electricity for the people of Karachi, said that a decision will be taken after a detailed review. During the hearing, Chief Financial Officer (CFO) Electric, while acknowledging the nine-hour loadshedding in Karachi, said that the demand for electricity is 3220 MW and the availability is 2800 MW, which has exceeded the shortfall of 400 MW.
NEPRA orders K-Electric for no loadshedding at night

Related Posts
Karachi"}],"exclude_current_post":true,"useQueryEditor":true,"user_id":24,"time":1764018053,"signature":"c8aa3842b9354b8f1c1502eef5af9de6","post_type":"post","post__not_in":[111103],"tax_query":[{"taxonomy":"category","field":"term_id","terms":[22]}],"paged":1}" data-page="1" data-max-pages="6586" data-start="1" data-end="4">


















