AGL38▲ 0.01 (0.00%)AIRLINK210.38▼ -5.15 (-0.02%)BOP9.48▼ -0.32 (-0.03%)CNERGY6.48▼ -0.31 (-0.05%)DCL8.96▼ -0.21 (-0.02%)DFML38.37▼ -0.59 (-0.02%)DGKC96.92▼ -3.33 (-0.03%)FCCL36.4▼ -0.3 (-0.01%)FFL14.95▲ 0.46 (0.03%)HUBC130.69▼ -3.44 (-0.03%)HUMNL13.29▼ -0.34 (-0.02%)KEL5.5▼ -0.19 (-0.03%)KOSM6.93▼ -0.39 (-0.05%)MLCF44.78▼ -1.09 (-0.02%)NBP59.07▼ -2.21 (-0.04%)OGDC230.13▼ -2.46 (-0.01%)PAEL39.29▼ -1.44 (-0.04%)PIBTL8.31▼ -0.27 (-0.03%)PPL200.35▼ -2.99 (-0.01%)PRL38.88▼ -1.93 (-0.05%)PTC26.88▼ -1.43 (-0.05%)SEARL103.63▼ -4.88 (-0.04%)TELE8.45▼ -0.29 (-0.03%)TOMCL35.25▼ -0.58 (-0.02%)TPLP13.52▼ -0.32 (-0.02%)TREET25.01▲ 0.63 (0.03%)TRG64.12▲ 2.97 (0.05%)UNITY34.52▼ -0.32 (-0.01%)WTL1.78▲ 0.06 (0.03%)

Gas supply from Wali Gas field injected into SNGPL’s network

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

 

In a landmark development, injection of gas supply into SNGPL’s network from OGDCL’s newly discovered gas field namely Wali (Bettani) in District Lakki Marwat of Khyber Pakhtunkhwa Province, has started earlier this morning (Friday). It is pertinent to mention that Oil and Gas Development Corporation (OGDCL) discovered Wali gas field last year. Accordingly, the Prime Minister of Pakistan Mian Muhammad Shehbaz Sharif and Federal Ministry of Energy (Petroleum Division) had directed SNGPL to lay pipelines for injection of gas from the newly discovered gas field.

The gas flow from Wali gas field will be processed at OGDCL’s facility before being injected into Sui Northern’s transmission system. Current gas supply flowrate from the gas field is 10 MMCFD which is expected to rise to 20 MMCFD in near future. The gas is supplied vide recently constructed 50-kilometer long high-pressure pipeline connecting OGDCL’s processing plant to Sui Northern’s network at Kaka Khel, District Lakki Marwat. In addition, SNGPL also constructed a 16-kilometer-long gathering line on OGDCL’s request as contractor.

 

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer