AGL39.71▼ -0.42 (-0.01%)AIRLINK189.85▲ 0.42 (0.00%)BOP9.83▼ -0.51 (-0.05%)CNERGY7.01▼ -0.2 (-0.03%)DCL10.24▲ 0.03 (0.00%)DFML41.31▼ -0.49 (-0.01%)DGKC105.99▼ -2.64 (-0.02%)FCCL37.72▼ -0.87 (-0.02%)FFBL93.41▲ 3.5 (0.04%)FFL15▼ -0.02 (0.00%)HUBC122.3▼ -0.93 (-0.01%)HUMNL14.31▼ -0.14 (-0.01%)KEL6.32▼ -0.02 (0.00%)KOSM8.12▼ -0.28 (-0.03%)MLCF48.78▼ -0.69 (-0.01%)NBP72.31▼ -2.51 (-0.03%)OGDC222.95▲ 9.54 (0.04%)PAEL33.62▲ 0.63 (0.02%)PIBTL9.67▲ 0.6 (0.07%)PPL201.45▲ 1.52 (0.01%)PRL33.8▼ -0.75 (-0.02%)PTC26.59▼ -0.62 (-0.02%)SEARL116.87▼ -1.32 (-0.01%)TELE9.63▼ -0.25 (-0.03%)TOMCL36.61▲ 1.19 (0.03%)TPLP11.95▼ -0.62 (-0.05%)TREET24.49▲ 2.2 (0.10%)TRG61.36▲ 0.46 (0.01%)UNITY36.06▼ -0.63 (-0.02%)WTL1.79▲ 0 (0.00%)

DC reviews repair of urban roads

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Following the guidelines of the Punjab government, the Lahore Metropolitan Corporation (MCL) is actively in-volved in repair of important city roads. Lahore Deputy Commissioner and MCL Administrator Raffia Haider conducted an inspection tour on Wednesday to assess progress of urban roads repair. During the inspection, the DC examined the ongoing construction work on Kashmir Road and Lake Road, say-ing that Kashmir Road is being rehabilitating with an al-located budget of Rs 15 million, adding that on Kashmir Road, a 1,000-foot carpeted road is set to be constructed, further enhancing the infrastructure. The DC maintained that the rehabilitation of Lake Road is a major project, with an estimated cost of Rs 36 million, saying that a 1500-foot section of Lake Road is currently undergoing carpeting and repair to ensure improved road conditions. Furthermore, to address traffic challenges, patchwork is being conducted on 299 roads throughout the city, as part of a comprehensive road rehabilitation plan. This initiative is aligned with recommendations from the traffic police and aims to alleviate congestion issues, she affirmed.

Related Posts

Get Alerts