AGL37.4▼ -0.6 (-0.02%)AIRLINK217▲ 3.09 (0.01%)BOP9.49▲ 0.07 (0.01%)CNERGY6.63▲ 0.34 (0.05%)DCL8.8▲ 0.03 (0.00%)DFML42.75▲ 0.54 (0.01%)DGKC94.89▲ 0.77 (0.01%)FCCL35.55▲ 0.36 (0.01%)FFL17.75▲ 1.36 (0.08%)HUBC127.72▲ 0.82 (0.01%)HUMNL13.9▲ 0.53 (0.04%)KEL5.35▲ 0.04 (0.01%)KOSM6.91▼ -0.03 (0.00%)MLCF43.65▲ 0.67 (0.02%)NBP59.68▲ 0.83 (0.01%)OGDC222.35▲ 2.93 (0.01%)PAEL39.9▲ 0.74 (0.02%)PIBTL8.28▲ 0.1 (0.01%)PPL195.4▲ 3.74 (0.02%)PRL38.9▲ 0.98 (0.03%)PTC27.6▲ 1.26 (0.05%)SEARL104.9▲ 0.9 (0.01%)TELE8.55▲ 0.16 (0.02%)TOMCL34.8▲ 0.05 (0.00%)TPLP13.13▲ 0.25 (0.02%)TREET25.55▲ 0.21 (0.01%)TRG73▲ 2.55 (0.04%)UNITY33.2▼ -0.19 (-0.01%)WTL1.72▲ 0 (0.00%)

CDA expedites work to meet water shortage in capital

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

On the direction of Chairman Capital Development Authority (CDA), the Water Management Wing has expedited work on several projects to meet the water shortage in the city of Islamabad. So that the citizens can be provided with uninterrupted water and they do not have to face any kind of difficulties.

In this regard, on the direction of the Chairman Capital Development Authority (CDA), the Water Management Wing has been completely resolved all the repair work and complaints like leakages, including replacement of old and rotten pipes in the Simli Water Filtration Plant and Main Condition Line. It should be noted that the timely action of the Water Supply Wing has not only saved 8 lakh gallons of water per day but also increased the water pressure in the pipelines. Similarly, complaints like leakages in water supply lines have been removed in Sector G-7/3.

It should be noted that the water level in other dams including Khanpur dam has decreased due to lack of required rains in monsoon. Therefore, before the arrival of summer, the water supply department is busy around the clock to meet the shortage of water so that the citizens get adequate water supply.

Additionally, the installation of 4 new tube wells in Sector F-10, F-11, G-10, G-11 will also be started soon by the Water Supply Department. So that in case the water reserves in Khanpur Dam decreases, the water shortage can be met with tube wells. In this regard, tenders have been published in newspapers so that water shortage can be controlled before the arrival of summer. Apart from this, work will be started soon to eliminate water leakages in other water networks including main condition lines at a cost of 60 crore rupees so that more water can be saved.

Similarly, water tanker service has also been alert by the water supply department in view of the current situation. Considering the situation of the citizens, helpline number 9202218 has also been issued by the Water Supply Wing. Similarly, citizens can register their complaints on WhatsApp number 0335775444. It should be noted that timely redressal of received complaints will be ensured in all circumstances.

The Water Supply Wing has appealed to the citizens to be careful in using water so that maximum water can be used. Similarly, strict action is being taken against those who waste water so that water reserves can be made more safe.

 

Related Posts

Get Alerts