AGL38▲ 0.01 (0.00%)AIRLINK210.38▼ -5.15 (-0.02%)BOP9.48▼ -0.32 (-0.03%)CNERGY6.48▼ -0.31 (-0.05%)DCL8.96▼ -0.21 (-0.02%)DFML38.37▼ -0.59 (-0.02%)DGKC96.92▼ -3.33 (-0.03%)FCCL36.4▼ -0.3 (-0.01%)FFL14.95▲ 0.46 (0.03%)HUBC130.69▼ -3.44 (-0.03%)HUMNL13.29▼ -0.34 (-0.02%)KEL5.5▼ -0.19 (-0.03%)KOSM6.93▼ -0.39 (-0.05%)MLCF44.78▼ -1.09 (-0.02%)NBP59.07▼ -2.21 (-0.04%)OGDC230.13▼ -2.46 (-0.01%)PAEL39.29▼ -1.44 (-0.04%)PIBTL8.31▼ -0.27 (-0.03%)PPL200.35▼ -2.99 (-0.01%)PRL38.88▼ -1.93 (-0.05%)PTC26.88▼ -1.43 (-0.05%)SEARL103.63▼ -4.88 (-0.04%)TELE8.45▼ -0.29 (-0.03%)TOMCL35.25▼ -0.58 (-0.02%)TPLP13.52▼ -0.32 (-0.02%)TREET25.01▲ 0.63 (0.03%)TRG64.12▲ 2.97 (0.05%)UNITY34.52▼ -0.32 (-0.01%)WTL1.78▲ 0.06 (0.03%)

Canals desilting, maintenance from Dec 26th

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Provincial Irrigation Department has released the Schedule for the desilting, repair and maintenance of various canals across the province, cleaning and annual closure of all canals coming out of Mangla and Tarbela Dams for the Rabi season 2022-23.

According to the details, Lower Jhelum Canal and Rasul-Qadirabad Link Canal coming out of Mangla Command will remain closed from 26th December, 2022 to 12th January, 2023.

Qadirabad-Balloki Link Canal from 27th December to 13th January, Lower Bari Doab Canal and Balloki-Sulemanki Canal from 29th December to 15th January, Upper Pakpattan Canal and Eastern Sadiqia Canal from 30th December to 16th January, Upper Jhelum Canal from 12th January to 29th January, Lower Chenab Canal from 13th January to 30th January, Jhang Branch from December 27 to January 13, Upper Bahawal Canal from January 13, to January 30, Upper Chenab Canal December 26 to January 12 and Central Bari Doab Canal December 27 to January 13.

Related Posts

Get Alerts