AGL39.58▼ -0.42 (-0.01%)AIRLINK131.22▲ 2.16 (0.02%)BOP6.81▲ 0.06 (0.01%)CNERGY4.71▲ 0.22 (0.05%)DCL8.44▼ -0.11 (-0.01%)DFML41.47▲ 0.65 (0.02%)DGKC82.09▲ 1.13 (0.01%)FCCL33.1▲ 0.33 (0.01%)FFBL72.87▼ -1.56 (-0.02%)FFL12.26▲ 0.52 (0.04%)HUBC110.74▲ 1.16 (0.01%)HUMNL14.51▲ 0.76 (0.06%)KEL5.19▼ -0.12 (-0.02%)KOSM7.61▼ -0.11 (-0.01%)MLCF38.9▲ 0.3 (0.01%)NBP64.01▲ 0.5 (0.01%)OGDC192.82▼ -1.87 (-0.01%)PAEL25.68▼ -0.03 (0.00%)PIBTL7.34▼ -0.05 (-0.01%)PPL154.07▼ -1.38 (-0.01%)PRL25.83▲ 0.04 (0.00%)PTC17.81▲ 0.31 (0.02%)SEARL82.3▲ 3.65 (0.05%)TELE7.76▼ -0.1 (-0.01%)TOMCL33.46▼ -0.27 (-0.01%)TPLP8.49▲ 0.09 (0.01%)TREET16.62▲ 0.35 (0.02%)TRG57.4▼ -0.82 (-0.01%)UNITY27.51▲ 0.02 (0.00%)WTL1.37▼ -0.02 (-0.01%)

Railways resumes clearance of KCR track

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Staff Reporter

The team of Pakistan Railways has re-started work to clear the Karachi Circular Railways (KCR) on the directives of the Supreme Court. In order to make clear the KCR route for revival of this historic mass transit project, the Pakistan Railways has constituted three teams, of its officials for clearance of carcass from the areas where encroachments have been eliminated.
The teams with their different timelines for completing the desired tasks have started their work. The debris will be cleared from the areas include Urdu college – Lyari River, Geelani & Liaquatabad, NIPA flyover – Karachi University station, remaining work from Level Crossing 17 near Manghopir to Orangi Station and Orangi station towards Geelani.

Related Posts

Get Alerts