AGL40▲ 0 (0.00%)AIRLINK129.06▼ -0.47 (0.00%)BOP6.75▲ 0.07 (0.01%)CNERGY4.49▼ -0.14 (-0.03%)DCL8.55▼ -0.39 (-0.04%)DFML40.82▼ -0.87 (-0.02%)DGKC80.96▼ -2.81 (-0.03%)FCCL32.77▲ 0 (0.00%)FFBL74.43▼ -1.04 (-0.01%)FFL11.74▲ 0.27 (0.02%)HUBC109.58▼ -0.97 (-0.01%)HUMNL13.75▼ -0.81 (-0.06%)KEL5.31▼ -0.08 (-0.01%)KOSM7.72▼ -0.68 (-0.08%)MLCF38.6▼ -1.19 (-0.03%)NBP63.51▲ 3.22 (0.05%)OGDC194.69▼ -4.97 (-0.02%)PAEL25.71▼ -0.94 (-0.04%)PIBTL7.39▼ -0.27 (-0.04%)PPL155.45▼ -2.47 (-0.02%)PRL25.79▼ -0.94 (-0.04%)PTC17.5▼ -0.96 (-0.05%)SEARL78.65▼ -3.79 (-0.05%)TELE7.86▼ -0.45 (-0.05%)TOMCL33.73▼ -0.78 (-0.02%)TPLP8.4▼ -0.66 (-0.07%)TREET16.27▼ -1.2 (-0.07%)TRG58.22▼ -3.1 (-0.05%)UNITY27.49▲ 0.06 (0.00%)WTL1.39▲ 0.01 (0.01%)

CDWP approves Rs 4.54 billion Energy Sector Project for Gwadar

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

To address the electricity demands of Gwadar, the Central Development Working Party (CDWP) approved a crucial “revised” energy project.

This project focuses on enhancing the transmission line infrastructure for the coastal city, marking a significant step forward in meeting Gwadar’s energy needs.

The CDWP meeting, led by Deputy Chairman of the Planning Commission, Mohammad Jehanzeb Khan, sanctioned the energy project for Gwadar along with another initiative in the Khyber Pakhtunkhwa province following detailed discussions.

The approved energy sector project, titled “Construction of 220kV Transmission Line (28km) along with 2nd Circuit Stringing of 132kV Transmission Line from Jiwani to Gwadar (94km) Revised,” is valued at Rs. 4540.010 million, GP reported.

This initiative, worth Rs. 4.54001 billion, aims to be financed through the Public Sector Development Program (PSDP).

Its primary objective is to provide an uninterrupted power supply to consumers across all categories and enhance the overall commercial viability of the power sector.

The project entails the construction of grid stations and includes the establishment of a 132kV (AIS) grid station in Jiwani, featuring a 132 KV Line Bay facing the Jiwani – Gwadar Circuit. It also involves setting up a 132kV (AIS) grid station in old Gwadar, including a 132 KV Line Bay facing the Gwadar (old) – Jiwani Circuit.

Furthermore, the project encompasses the construction of a 220/132kV Transmission Line from Gabd to Jiwani (Zero Point) and the second Circuit Stringing of the existing 132 kV SDT Jiwani–Gwadar (old) 99 KM Transmission Line (QESCO portion).

Related Posts

Get Alerts