AGL40▲ 0 (0.00%)AIRLINK129.06▼ -0.47 (0.00%)BOP6.75▲ 0.07 (0.01%)CNERGY4.49▼ -0.14 (-0.03%)DCL8.55▼ -0.39 (-0.04%)DFML40.82▼ -0.87 (-0.02%)DGKC80.96▼ -2.81 (-0.03%)FCCL32.77▲ 0 (0.00%)FFBL74.43▼ -1.04 (-0.01%)FFL11.74▲ 0.27 (0.02%)HUBC109.58▼ -0.97 (-0.01%)HUMNL13.75▼ -0.81 (-0.06%)KEL5.31▼ -0.08 (-0.01%)KOSM7.72▼ -0.68 (-0.08%)MLCF38.6▼ -1.19 (-0.03%)NBP63.51▲ 3.22 (0.05%)OGDC194.69▼ -4.97 (-0.02%)PAEL25.71▼ -0.94 (-0.04%)PIBTL7.39▼ -0.27 (-0.04%)PPL155.45▼ -2.47 (-0.02%)PRL25.79▼ -0.94 (-0.04%)PTC17.5▼ -0.96 (-0.05%)SEARL78.65▼ -3.79 (-0.05%)TELE7.86▼ -0.45 (-0.05%)TOMCL33.73▼ -0.78 (-0.02%)TPLP8.4▼ -0.66 (-0.07%)TREET16.27▼ -1.2 (-0.07%)TRG58.22▼ -3.1 (-0.05%)UNITY27.49▲ 0.06 (0.00%)WTL1.39▲ 0.01 (0.01%)

Punjab CM for measures to ensure smooth traffic flow

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Punjab Caretaker Chief Minister Mohsin Naqvi conducted a morning inspection of the ongoing Controlled Access Corridor project on Band Road.

He meticulously assessed the progress of this significant endeavor, spanning from Niazi Chowk to Babu Sabu. He underscored the importance of ensuring smooth traffic flow on the closed road throughout the construction phase. He emphasized that the Chief Traffic Officer (CTO) should personally oversee operations and recommended deploying additional traffic wardens.

Chief Minister Mohsin Naqvi promptly ordered the relocation of street lights and poles from the closed roads. He further directed that the poles be removed and re-purposed elsewhere. The Chief Minister set forth a clear directive for the timely completion of the controlled access corridor project. He highlighted that this project would grant immediate motorway access from any corner of Lahore upon its completion. The Controlled Access Corridor is poised to yield substantial savings, both in terms of time and fuel, benefiting the economy significantly. The Chief Minister received a comprehensive briefing, underscoring the round-the-clock efforts being made to complete the 7.3 km long controlled access corridor within four months.

The project encompasses two packages, with Package One spanning 3.65 km from Niazi to Sagian Interchange, and Package Two covering an equivalent distance from Sagian to Babu Sabu Interchange. Commissioner Lahore Division and DG LDA Muhammad Ali Randhawa along with the Chief Engineer LDA and the contractor, provided detailed updates to Chief Minister Mohsin Naqvi regarding the projects progress. The event was attended by Provincial Information Minister Amir Mir, Chairman Planning and Development Board Iftikhar Sahu, CTO, and various other officials. Punjab Caretaker Chief Minister Mohsin Naqvi has said the role of rural women in building and progress of a society is greatly recognizable. In his message on the International Day of Rural Women, he stated that the role of Pakistani rural women for promotion of agriculture is praiseworthy. The rural women can only be empowered by imparting them education and the Punjab government is endeavouring its utmost in this regard, he informed. The government is duty-bound to grant complete and equal rights to the women, he asserted and outlined that if the rural women progresses than Pakistan will progress. He said we will utilise all our resources to improve and elevate the living standard of rural women. CM emphasized that the role of rural women in strengthening the economy of Pakistan cannot be overlooked.

Related Posts

Get Alerts