AGL39.71▼ -0.42 (-0.01%)AIRLINK189.85▲ 0.42 (0.00%)BOP9.83▼ -0.51 (-0.05%)CNERGY7.01▼ -0.2 (-0.03%)DCL10.24▲ 0.03 (0.00%)DFML41.31▼ -0.49 (-0.01%)DGKC105.99▼ -2.64 (-0.02%)FCCL37.72▼ -0.87 (-0.02%)FFBL93.41▲ 3.5 (0.04%)FFL15▼ -0.02 (0.00%)HUBC122.3▼ -0.93 (-0.01%)HUMNL14.31▼ -0.14 (-0.01%)KEL6.32▼ -0.02 (0.00%)KOSM8.12▼ -0.28 (-0.03%)MLCF48.78▼ -0.69 (-0.01%)NBP72.31▼ -2.51 (-0.03%)OGDC222.95▲ 9.54 (0.04%)PAEL33.62▲ 0.63 (0.02%)PIBTL9.67▲ 0.6 (0.07%)PPL201.45▲ 1.52 (0.01%)PRL33.8▼ -0.75 (-0.02%)PTC26.59▼ -0.62 (-0.02%)SEARL116.87▼ -1.32 (-0.01%)TELE9.63▼ -0.25 (-0.03%)TOMCL36.61▲ 1.19 (0.03%)TPLP11.95▼ -0.62 (-0.05%)TREET24.49▲ 2.2 (0.10%)TRG61.36▲ 0.46 (0.01%)UNITY36.06▼ -0.63 (-0.02%)WTL1.79▲ 0 (0.00%)

Karachi Airport to get international standard runways

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

The Civil Aviation Authority (CAA) has decided to build state-of-the-art runways at Jinnah International Airport, Karachi

According to details, the CAA has decided to build both runways – 25R/07L and 25L/07R – at Karachi Airport on international standards.The aviation authority has invited eligible companies to join the bid for the construction of the primary and secondary runways of the airport.In a statement, the CAA said all the domestic and foreign companies – which will participate in the bidding – must have relevant experience, skills and financial capacity.“Companies belonging to Pakistan must be registered with the Pakistan Engineering Council”, it added. The CAA officials noted that the pre-bid ceremony will be held on October 17, 2023 at 11:30 PM at Terminal One. Planes landing at Karachi Airport face laser light mischief

Last month, the Pakistan Civil Aviation Authority (PCAA) decided to construct a ‘state-of-the-art’ air traffic control (ATC) tower at Jinnah International Airport, Karachi. During a board meeting convened in Karachi, the Pakistan Civil Aviation Authority (PCAA) approved crucial decisions geared towards improving airport infrastructure and safety measures.

The authority decided to construct a world-class Air Traffic Control (ATC) tower and a Rescue Fire Fighting (RFF) complex at Jinnah International Airport. Sources indicated that the current ATC tower, which has been in service for a remarkable 91 years, faces height limitations and is no longer considered adequate for modern aviation needs.The approval for a new, modern ATC tower is expected to not only address these limitations but also significantly improve visibility and flight safety, meanwhile, the project is expected to complete in a year. Furthermore, the decision to establish a RFF complex is aimed at boost fire safety measures at Karachi airport.

 

Related Posts

Get Alerts