AGL37.11▼ -0.99 (-0.03%)AIRLINK212.82▲ 3.27 (0.02%)BOP10.25▼ -0.21 (-0.02%)CNERGY7▼ -0.35 (-0.05%)DCL8.74▼ -0.16 (-0.02%)DFML38.69▼ -2.14 (-0.05%)DGKC97.45▼ -2.32 (-0.02%)FCCL33.47▼ -0.92 (-0.03%)FFL17.64▼ -0.41 (-0.02%)HUBC129.11▼ -3.38 (-0.03%)HUMNL13.86▼ -0.28 (-0.02%)KEL4.86▼ -0.17 (-0.03%)KOSM6.93▼ -0.14 (-0.02%)MLCF43.63▼ -1.57 (-0.03%)NBP61.39▼ -0.78 (-0.01%)OGDC212.95▼ -5.43 (-0.02%)PAEL41.17▼ -0.53 (-0.01%)PIBTL8.63▲ 0.08 (0.01%)PPL183.03▼ -6 (-0.03%)PRL39.63▼ -2.7 (-0.06%)PTC24.73▼ -0.44 (-0.02%)SEARL98.01▼ -5.95 (-0.06%)TELE9▼ -0.24 (-0.03%)TOMCL35.19▼ -0.2 (-0.01%)TPLP12.4▼ -0.7 (-0.05%)TREET23.62▼ -0.05 (0.00%)TRG65.68▼ -3.5 (-0.05%)UNITY33.98▼ -0.84 (-0.02%)WTL1.79▲ 0.08 (0.05%)

Kohala Hydro power project to complete by 2025

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

The 1,124 MW Kohala Hydropower Project is likely to be completed by December 2025 with the cost of $2.4 billion. The annual generation capacity of run-of-the-river project is 4,800 GWh, said an official source.

The diversion dam site is on Jhelum River near Sarran Village 40 km upstream from Muzaffarabad and a 20 km long tunnel connects to the powerhouse which is located at Barsala, 7 km upstream from Kohala Bridge.

The Kohala hydroelectric scheme will have a gravity, roller-concrete compacted dam on the upper branch of the Jhelum, 40 km from Muzaffarabad. —APP

Related Posts

Get Alerts

© 2024 All rights reserved | Pakistan Observer