AGL40.94▲ 0.69 (0.02%)AIRLINK129.5▼ -0.16 (0.00%)BOP6.33▼ -0.24 (-0.04%)CNERGY4.01▼ -0.01 (0.00%)DCL8.4▼ -0.04 (0.00%)DFML42.6▲ 1.27 (0.03%)DGKC87.1▲ 0.11 (0.00%)FCCL33.58▲ 0.14 (0.00%)FFBL65.95▲ 0.06 (0.00%)FFL10.67▲ 0.2 (0.02%)HUBC112.81▲ 2.19 (0.02%)HUMNL15.8▲ 0.63 (0.04%)KEL4.82▲ 0.02 (0.00%)KOSM7.88▲ 0.05 (0.01%)MLCF42.01▲ 0.02 (0.00%)NBP60.5▼ -0.18 (0.00%)OGDC184.01▲ 0.79 (0.00%)PAEL25.41▲ 0.11 (0.00%)PIBTL7.26▲ 1 (0.16%)PPL146.21▲ 0.59 (0.00%)PRL24.53▼ -0.01 (0.00%)PTC16.3▲ 0.19 (0.01%)SEARL70.5▲ 0.02 (0.00%)TELE7.36▲ 0.07 (0.01%)TOMCL36.1▼ -0.1 (0.00%)TPLP8.05▲ 0.22 (0.03%)TREET15.2▼ -0.15 (-0.01%)TRG51.44▼ -0.27 (-0.01%)UNITY27.5▲ 0.23 (0.01%)WTL1.28▲ 0.05 (0.04%)

  Water supplies, drainage problems in Malir to be resolved: VC KW&SB

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

The delegation led by PP leader Jan Muhammad Baloch met with VC KW&SB Syed Najmi Alam at Chairman Secretariat Karsaz & informed about the various problems of water supply & drainage in District Malir & said that effective steps should be taken to solve all the problems immediately, The VC KW&SB assured the PP leader of the immediate solution of all the problems related to water supply & drainage presented during the meeting & ordered SE District Malir Muhammad Riaz on the spot to oblige that on behalf of the delegation Including all the presented problems, water supply & drainage problems across the city should be solved on a priority basis & better facilities should be provided to the citizens, During the meeting S.O To VC KW&SB Nadeem Ahmed Kirmani, SE Malir Muhammad Riaz & other officers of the KW&SB were present.

Related Posts