AGL36.97▲ 0.39 (0.01%)AIRLINK189.64▼ -7.01 (-0.04%)BOP10.09▼ -0.05 (0.00%)CNERGY6.68▼ -0.01 (0.00%)DCL8.58▲ 0.06 (0.01%)DFML37.4▼ -0.48 (-0.01%)DGKC99.75▲ 4.52 (0.05%)FCCL34.14▲ 1.12 (0.03%)FFL17.09▲ 0.44 (0.03%)HUBC126.05▼ -1.24 (-0.01%)HUMNL13.79▼ -0.11 (-0.01%)KEL4.77▲ 0.01 (0.00%)KOSM6.58▲ 0.21 (0.03%)MLCF43.28▲ 1.06 (0.03%)NBP60.99▲ 0.23 (0.00%)OGDC224.96▲ 11.93 (0.06%)PAEL41.74▲ 0.87 (0.02%)PIBTL8.41▲ 0.12 (0.01%)PPL193.09▲ 9.52 (0.05%)PRL37.34▼ -0.93 (-0.02%)PTC24.02▼ -0.05 (0.00%)SEARL94.54▼ -0.57 (-0.01%)TELE8.66▼ -0.07 (-0.01%)TOMCL34.53▼ -0.18 (-0.01%)TPLP12.39▲ 0.18 (0.01%)TREET22.37▼ -0.21 (-0.01%)TRG62.65▼ -1.71 (-0.03%)UNITY32.47▼ -0.24 (-0.01%)WTL1.75▼ -0.04 (-0.02%)

Electricity shortfall reaches 5,000mw

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

The power crisis across the country has intensified as the overall electricity shortfall reached 5000 megawatts, it surfaced on Thursday.

According to sources, the unannounced load-shedding has begun across the country as the electricity shortfall has reached 5000MW. Sources privy to the development said that several power plants working on gas, coal and furnace oil have been closed. The duration of load-shedding in Punjab has reached 3 to 10 hours.

Lahore Electricity Supply Company Limited (LESCO) is facing shortage of 1000mw as the demand is 4,100mw and the available power is 3,100mw.

Currently, 610mw Engro Power Plant in Thar, Port Qasim’s power plant with a capacity of 310 are closed. Nuclear K2, K3, Chasnob, Liberty Power Plant, Guddu Power Plant are also facing shortage and not producing power at their full capacity.

 

Related Posts

Get Alerts