AGL39.5▼ -0.5 (-0.01%)AIRLINK128.18▼ -0.88 (-0.01%)BOP6.82▲ 0.07 (0.01%)CNERGY4.7▲ 0.21 (0.05%)DCL8.47▼ -0.08 (-0.01%)DFML41.28▲ 0.46 (0.01%)DGKC82.26▲ 1.3 (0.02%)FCCL32.95▲ 0.18 (0.01%)FFBL73.5▼ -0.93 (-0.01%)FFL11.88▲ 0.14 (0.01%)HUBC110.75▲ 1.17 (0.01%)HUMNL14.55▲ 0.8 (0.06%)KEL5.21▼ -0.1 (-0.02%)KOSM7.64▼ -0.08 (-0.01%)MLCF38.7▲ 0.1 (0.00%)NBP64▲ 0.49 (0.01%)OGDC193.11▼ -1.58 (-0.01%)PAEL25.56▼ -0.15 (-0.01%)PIBTL7.37▼ -0.02 (0.00%)PPL154.94▼ -0.51 (0.00%)PRL25.9▲ 0.11 (0.00%)PTC17.91▲ 0.41 (0.02%)SEARL82.76▲ 4.11 (0.05%)TELE7.71▼ -0.15 (-0.02%)TOMCL33.31▼ -0.42 (-0.01%)TPLP8.54▲ 0.14 (0.02%)TREET16.46▲ 0.19 (0.01%)TRG56.81▼ -1.41 (-0.02%)UNITY27.55▲ 0.06 (0.00%)WTL1.38▼ -0.01 (-0.01%)

CDA Chairman directs to complete dev work of Park Enclave at earliest

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]
City Reporter

Chairman Capital Development Authority Amir Ali Ahmed visited Park Enclave, reviewed the development works and issued instructions to the officers of relevant departments to complete the development work on time.

Member Engineering Munawar Shah briefed the Chairman regarding the development works of Park Enclave, Park Enclave Two, Park Enclave III, construction of roads, earthwork, water supply, construction of sewerage lines.

Chairman CDA directed that basic civic amenities in Park Enclave One should be further improved, the environmental work in the parks should be started immediately and completed by the end of July.

Preparations for the flowering and planting process should be completed before the monsoon so that they can be planted as much as possible.

Related Posts

Get Alerts