AGL39.1▼ -0.9 (-0.02%)AIRLINK129.16▲ 0.1 (0.00%)BOP6.76▲ 0.01 (0.00%)CNERGY4.72▲ 0.23 (0.05%)DCL8.46▼ -0.09 (-0.01%)DFML41▲ 0.18 (0.00%)DGKC81.35▲ 0.39 (0.00%)FCCL32.91▲ 0.14 (0.00%)FFBL74.69▲ 0.26 (0.00%)FFL11.81▲ 0.07 (0.01%)HUBC109.5▼ -0.08 (0.00%)HUMNL14.05▲ 0.3 (0.02%)KEL5.26▼ -0.05 (-0.01%)KOSM7.76▲ 0.04 (0.01%)MLCF38.31▼ -0.29 (-0.01%)NBP64.8▲ 1.29 (0.02%)OGDC193.54▼ -1.15 (-0.01%)PAEL25.65▼ -0.06 (0.00%)PIBTL7.38▼ -0.01 (0.00%)PPL154.75▼ -0.7 (0.00%)PRL25.51▼ -0.28 (-0.01%)PTC17.4▼ -0.1 (-0.01%)SEARL79.4▲ 0.75 (0.01%)TELE7.71▼ -0.15 (-0.02%)TOMCL33.65▼ -0.08 (0.00%)TPLP8.5▲ 0.1 (0.01%)TREET16.24▼ -0.03 (0.00%)TRG57.98▼ -0.24 (0.00%)UNITY27.7▲ 0.21 (0.01%)WTL1.39▲ 0 (0.00%)

Construction of 3.73 MW solar power project completed

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

 

The Reon Energy Limited on Monday announced the completion of its’ 3.73 MW captive Solar Power Project for G&T Group in Karachi. The Solar Photovoltaic Plant is the largest bi-facial PV rooftops in the country.

The 3.73 MW Photovoltaic Project is expected to produce approximately 6,152 MWh (Megawatt hours) annually. The project is dispersed across 4-locations including Gatron at Hub, Mustaqim Dyeing and Printing at SITE and Nooriabad and Novatex at Landhi.

The output energy will be used on-site, reducing gas consumption, and avoiding around 3780 Tonnes of CO2 equivalent emissions during the plant life. Bi-facial solar modules applied at G&T, that can absorb sunlight from both faces- front and back, have significantly improved energy production by up to 10%.

The project ensured strict compliance with COVID-19 protocols during execution. A total of 80 jobs were created for the locals during execution.

Related Posts

Get Alerts