AGL40.21▲ 0.18 (0.00%)AIRLINK127.64▼ -0.06 (0.00%)BOP6.67▲ 0.06 (0.01%)CNERGY4.45▼ -0.15 (-0.03%)DCL8.73▼ -0.06 (-0.01%)DFML41.16▼ -0.42 (-0.01%)DGKC86.11▲ 0.32 (0.00%)FCCL32.56▲ 0.07 (0.00%)FFBL64.38▲ 0.35 (0.01%)FFL11.61▲ 1.06 (0.10%)HUBC112.46▲ 1.69 (0.02%)HUMNL14.81▼ -0.26 (-0.02%)KEL5.04▲ 0.16 (0.03%)KOSM7.36▼ -0.09 (-0.01%)MLCF40.33▼ -0.19 (0.00%)NBP61.08▲ 0.03 (0.00%)OGDC194.18▼ -0.69 (0.00%)PAEL26.91▼ -0.6 (-0.02%)PIBTL7.28▼ -0.53 (-0.07%)PPL152.68▲ 0.15 (0.00%)PRL26.22▼ -0.36 (-0.01%)PTC16.14▼ -0.12 (-0.01%)SEARL85.7▲ 1.56 (0.02%)TELE7.67▼ -0.29 (-0.04%)TOMCL36.47▼ -0.13 (0.00%)TPLP8.79▲ 0.13 (0.02%)TREET16.84▼ -0.82 (-0.05%)TRG62.74▲ 4.12 (0.07%)UNITY28.2▲ 1.34 (0.05%)WTL1.34▼ -0.04 (-0.03%)

Repair of Karakorum Highway urged

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Abdul Khaliq Qureshi

Abbottabad

SSP Traffic Abbottabad Tariq Mehmood has asked the NHA officials to speed up the repair work of the Karakorum High Way on war foot basis and preferably to be done in the night keeping the pressure of traffic on the main road as KKH is the only road which links Six district of Abbottabad with Northern Areas and Muzaffarabad beside the local city, the Ayub Medcial complex. It should be noted that repair work on the only main road of Abbottabad from Piffer Chowk to Mir purr is underway but the slow phase of the work is creating traffic problems for the locals as well as for the other commuters.

Related Posts