AGL39.71▼ -0.42 (-0.01%)AIRLINK189.85▲ 0.42 (0.00%)BOP9.83▼ -0.51 (-0.05%)CNERGY7.01▼ -0.2 (-0.03%)DCL10.24▲ 0.03 (0.00%)DFML41.31▼ -0.49 (-0.01%)DGKC105.99▼ -2.64 (-0.02%)FCCL37.72▼ -0.87 (-0.02%)FFBL93.41▲ 3.5 (0.04%)FFL15▼ -0.02 (0.00%)HUBC122.3▼ -0.93 (-0.01%)HUMNL14.31▼ -0.14 (-0.01%)KEL6.32▼ -0.02 (0.00%)KOSM8.12▼ -0.28 (-0.03%)MLCF48.78▼ -0.69 (-0.01%)NBP72.31▼ -2.51 (-0.03%)OGDC222.95▲ 9.54 (0.04%)PAEL33.62▲ 0.63 (0.02%)PIBTL9.67▲ 0.6 (0.07%)PPL201.45▲ 1.52 (0.01%)PRL33.8▼ -0.75 (-0.02%)PTC26.59▼ -0.62 (-0.02%)SEARL116.87▼ -1.32 (-0.01%)TELE9.63▼ -0.25 (-0.03%)TOMCL36.61▲ 1.19 (0.03%)TPLP11.95▼ -0.62 (-0.05%)TREET24.49▲ 2.2 (0.10%)TRG61.36▲ 0.46 (0.01%)UNITY36.06▼ -0.63 (-0.02%)WTL1.79▲ 0 (0.00%)

72 inch dimeter line affected after KE power breakdown

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

A 72 inches diameter MS line No. Five affected due to sudden power breakdown by K Electric at Dhabeji Pumping Station, according to the spokesperson of Water Corporation, after receiving information about the line being affected, the Water Corporation officials reached the spot and inspected the affected line.

On this occasion, CEO Water Corporation Engineer Syed Sallahuddin Ahmed instructed the concerned officers and said that the restoration work of the affected line should be completed on an emergency basis, So that the citizens do not have to face any kind of problems, In this regard, the Water Corporation officials started the restoration work of the affected line on an emergency basis, according to Chief Engineer Bulk Water Corporation, water supply to the city continues through alternate lines.

Related Posts

Get Alerts