AGL40.13▲ 0.12 (0.00%)AIRLINK189.43▲ 1.45 (0.01%)BOP10.34▲ 0.22 (0.02%)CNERGY7.21▲ 0.1 (0.01%)DCL10.21▲ 0.06 (0.01%)DFML41.8▲ 0.23 (0.01%)DGKC108.63▲ 0.72 (0.01%)FCCL38.59▼ -0.41 (-0.01%)FFBL89.91▲ 7.89 (0.10%)FFL15.02▲ 0.12 (0.01%)HUBC123.23▲ 3.77 (0.03%)HUMNL14.45▲ 0.4 (0.03%)KEL6.34▼ -0.06 (-0.01%)KOSM8.4▲ 0.33 (0.04%)MLCF49.47▲ 0 (0.00%)NBP74.82▲ 1.16 (0.02%)OGDC213.41▲ 8.56 (0.04%)PAEL32.99▼ -0.57 (-0.02%)PIBTL9.07▲ 1 (0.12%)PPL199.93▲ 14.52 (0.08%)PRL34.55▲ 0.94 (0.03%)PTC27.21▼ -0.18 (-0.01%)SEARL118.19▼ -1.63 (-0.01%)TELE9.88▲ 0.19 (0.02%)TOMCL35.42▲ 0.12 (0.00%)TPLP12.57▲ 0.32 (0.03%)TREET22.29▲ 2.03 (0.10%)TRG60.9▲ 0.12 (0.00%)UNITY36.69▼ -1.3 (-0.03%)WTL1.79▲ 0.14 (0.08%)

PARCO shuts down Refinery for maintenance

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

On Wednesday night Pak-Arab Refinery Ltd. temporarily shut down its refinery operations for five days as part of its scheduled maintenance work. The refinery will resume its operations by April 11, 2023. The scheduled maintenance will not affect the supply of both Diesel and Gasoline (petrol).

Related Posts

Get Alerts