AGL40.08▲ 0.05 (0.00%)AIRLINK127.95▲ 0.25 (0.00%)BOP6.7▲ 0.09 (0.01%)CNERGY4.47▼ -0.13 (-0.03%)DCL8.92▲ 0.13 (0.01%)DFML41.63▲ 0.05 (0.00%)DGKC87.5▲ 1.71 (0.02%)FCCL32.89▲ 0.4 (0.01%)FFBL64.5▲ 0.47 (0.01%)FFL11.4▲ 0.85 (0.08%)HUBC111.5▲ 0.73 (0.01%)HUMNL14.81▼ -0.26 (-0.02%)KEL5.04▲ 0.16 (0.03%)KOSM7.35▼ -0.1 (-0.01%)MLCF41.11▲ 0.59 (0.01%)NBP61.6▲ 0.55 (0.01%)OGDC194.75▼ -0.12 (0.00%)PAEL27.45▼ -0.06 (0.00%)PIBTL7.78▼ -0.03 (0.00%)PPL152.77▲ 0.24 (0.00%)PRL26.58▲ 0 (0.00%)PTC16.1▼ -0.16 (-0.01%)SEARL84.32▲ 0.18 (0.00%)TELE7.92▼ -0.04 (-0.01%)TOMCL36.7▲ 0.1 (0.00%)TPLP8.83▲ 0.17 (0.02%)TREET17.15▼ -0.51 (-0.03%)TRG57.2▼ -1.42 (-0.02%)UNITY26.7▼ -0.16 (-0.01%)WTL1.32▼ -0.06 (-0.04%)

Hamad calls for timely completion of development work

Share
Tweet
WhatsApp
Share on Linkedin
[tta_listen_btn]

Administrator DMC South, Hammad ND Khan has said that only with the timely completion of any kind of development and repair work, the people can benefit from their true fruits. The strength and durability of the road construction and repair work is being given great importance under the future requirements.

He expressed these views on the occasion of inspecting the ongoing works of mechanical ironing on different roads of Bath Island, Clifton. On this occasion, SE Rafiq Sheikh and Axin B&R also accompanied him.

 

Related Posts

© 2024 All rights reserved | Pakistan Observer