Shahbaz reviews pace of work on 1320MW Coal Power Plant

shahbaz.jpg

Salim Ahmed

Lahore—Punjab Chief Minister Muhammad Shehbaz Sharif reviewed the pace of work on 1320 megawatts Coal Power Plant near Qadirabad.
Shehbaz Sharif inspected the cooling tower of the coal power plant and as well as other sections of the project. He expressed his satisfaction over the pace of work and gave Shabash to Chinese engineers and labourers. The head of the Chinese engineers Mr. Sang gave a briefing to the Chief Minister.
Shehbaz Sharif said that the Chinese engineers and the whole nation should be congratulated on the way the project is being implemented. He said that the project will be completed well before the stipulated period and help in eliminating darkness from the country. He said that the efforts of the government to control loadshedding will succeed.

Share this post

PinIt
    scroll to top