Road awaiting completion

Fida Zaman Turbat

Turbat road construction was started in 2014 by former CM Dr, Abdul Malik. The construction of the road is a serious task; but no actions have been taken to complete it. The citizens face difficulties and are unable to reach their workplaces on time. Likewise, the accidents are occurring daily and the city is being over crowded.
The construction work on a road in Absor was started but has been stopped due to external threat of terror groups. The construction is stopped after the cracker attacks during the past two days. The people are in critical situation. I thus request the CM Sanaullah to take the construction on going.
—Via email

Share this post

PinIt
    scroll to top